Social

Navi Mumbai Metro Opening Date Timing, fare Check Detail 

Navi Mumbai has become Largest fifth city in India and the third in Maharashtra to actively consider Metro Train Starting from 15 Aug 2023.

From Belapur to Pendhar (Taloja)

Navi Mumbai Metro will be 11 kilometres long and have 11 metro stations.

The Navi Mumbai Metro will connect the Belapur metro station to the Navi Mumbai International Airport (NMIA).

The initial phase of construction Completed, from Belapur to Pendhar(Taloja), would be 11.10 km long and include 11 elevated stations.

There will be a terminus in Belapur and a depot/workshop at the Taloja metro station.

Belapur To Kharghar – Taloja Ticket Rates

Fare for the Navi Mumbai Metro Line is Rs 10 per 2 kilometers. Between 2-4 km, the fare will be Rs 14; for 4-6 km, the fare will be Rs 20; between 6 and 8 km, the fare will be Rs 25; between 8-10 km, the fare is Rs 30; it will be Rs 40 for 10 kilometers.

Belapur to Pendhar (Taloja ) Station (Stop)Name

Operation will start 15 Aug 2023

PhaseTerminalLengthStationsCost
IBelapur-Kharghar-Taloja-Pendhar11.10 kilometres (6.90 mi)11₹1,985 crore (US$250 million)

Metro Train length

Metro 3 coaches

Navi Mumbai Metro Project Cost

Rs 1985 Crore.

Leave a Comment