Renovation is basically a very complex and labor-intensive affair. The room in question is finally restored to its raw state – it is stripped down to its walls.
However, if the bathroom at home is already getting on in years and no longer corresponds to the idea of a modern wellness area, a corresponding bathroom renovation is usually indispensable. But even if the upcoming work may seem overwhelming at first: After a few weeks, the bathroom can already shine in new splendor.
The following article shows in detail how a bathroom renovation usually proceeds and what work needs to be done.
The process of a complete bathroom renovation
The planning
Once the decision has been made to finally tackle the renovation of the bathroom, planning can begin. It is advisable to enlist the help of experts. In this way, it is possible to ensure that the best result is actually achieved from the existing conditions.
Ordering materials and products
After the professional planning of the bathroom renovation and taking measurements on site, the required tiles and products for the new bathroom can be ordered. For the necessary inspiration is recommended, for example, to discover novoceram bathroom tiles. After the required products have been delivered, the actual work of the renovation can begin.
The dismantling
Once the construction site has been set up, the first step is disassembly. In the course of this, all existing bathroom objects, such as the bathtub, shower tray, washbasin, toilet, heating, shower partitions and fittings are removed. It is also necessary to chisel off the floor and wall tiles. In this context, it is also necessary to think about proper disposal of construction waste.
Renewal of pipes and lines
In the course of the renovation, the existing pipes and electrical lines are often to be renewed as well. In principle, it is recommended to replace the water pipes after a period of about 30 years in order not to risk serious water damage. If the positioning of the sanitary objects changes, the pipe routing may also have to be redesigned. The location of electrical wiring for switches, lamps and sockets must also be adjusted. As a rule, this requires the wall to be milled out.
The drywall work
Next, the plastering of the walls and the corresponding drywall work takes place. If there is a desire for pre-wall installations, such as a cistern that is fully recessed into the wall, the installation of drywall is necessary.
Tiling and waterproofing
After smoothing the walls, it is necessary to prepare the tiles. In addition, the setting of the bathtub and shower, respectively, can now take place. These must be completely sealed so that there is no danger of moisture penetrating into the floor. After that, the tiles can be laid, and then you need to do the painting work.
The final assembly
The last step in the process of bathroom renovation is the final assembly. As part of this, the sink, toilet and other sanitary objects find their intended place. Also, the installation of accessories, such as towel racks, and lamps, sockets and light switches must be carried out.
After the final cleaning of the room and acceptance, a shower partition may still need to be installed. The main thing here is to ensure an exact fit.